. You will need an installation space close to your main water inlet, a nearby drain (for the backwash/regenerative wastewater), and a standard electrical socket (230V/50Hz). 2. Verify Your Water Pressure
The Aqmos R2D2-72 relies on the highly intelligent . This control valve automatically measures your freshwater consumption and only triggers regeneration when absolutely necessary, saving you water and salt. 1. Power on the Unit aqmos r2d272 installation new
Plug the control valve's power supply into an electrical outlet. The LCD display will flash and show the current time and remaining system capacity [15†L9-L10].
This complete installation guide walks you through the step-by-step process of unboxing, plumbing plumbing integration, digital programming, and initial commissioning of your new Aqmos R2D2-72 Go to product viewer dialog for this item. Step 1: Unboxing and Site Requirements Verify Your Water Pressure The Aqmos R2D2-72 relies
A new installation is only as good as its first year of operation. Schedule quarterly checks:
Your softener's resin bed needs to undergo an initial "rinse" before it is ready to supply soft water to your home. On the BNT 1650 control valve, press and hold the manual regeneration button (often marked with a square or cycle icon) until the cycle begins. Power on the Unit Plug the control valve's
Locate the overflow elbow fitting on the side of the cabinet tank. Connect a separate line here and route it downwards toward the drain.
Fill the brine tank with high-purity regenerative salt tablets (according to DIN 19604, DIN EN 973 Type A).