Installation O peration and Maintenance Manual - Siel Invest
A safe, reliable SpeedStile F/L installation depends on careful site preparation, correct mechanical anchoring, disciplined electrical wiring and grounding, precise sensor alignment, and thorough commissioning with the end-user. Follow manufacturer wiring diagrams and safety guidance for your specific model. Keep configuration backups and a planned maintenance program to ensure long-term uptime and compliance.
The SpeedStile FL utilizes dry contact inputs for command validation. Locate the main I/O terminal strip on the Gunnebo logic controller:
Tighten the expansion anchors to the manufacturer's specified torque rating. Re-verify the level after tightening. 5. Electrical Connections and Wiring gunnebo speedstile fl installation manual
Before unboxing the units, the installation site must meet specific structural and environmental criteria:
Tighten the floor anchor bolts to the manufacturer-specified torque rating (typically 45–50 Nm for M10/M12 expansion anchors). Re-verify leveling after torking. Mounting the Glass Wings Ensure the drive shaft is in the fully closed position.
Connect the incoming AC power mains to the internal thermal-magnetic circuit breaker terminal block. Installation O peration and Maintenance Manual - Siel
: Secure the unit with a minimum bolting depth of 70mm .
Maintain a minimum 50mm clearance between the outer chassis and any fixed walls or architectural obstacles.
Status display turns green; glass wings open smoothly in the direction of travel; gate closes immediately after passage. The SpeedStile FL utilizes dry contact inputs for
Before unboxing, the installation site must meet specific structural requirements:
Cable conduits must run at least 140mm below the finished floor and rise at least 50mm from the foundation level. 2. Electrical Requirements
Locate the serial numbers and identification labels inside the maintenance hatches to determine the exact layout order.