The ThyssenKrupp Levant is a robust, curved stair lift designed for complex staircases with landings, intermediate turns, or spiral sections. One of the most critical installation scenarios is the , often required when the staircase ends at an elevated landing, a balcony, or a doorway with a floor-level obstruction directly at the top of the stairs.
Tighten the bolts securely using a socket wrench, verifying that the gear rack on the underside aligns perfectly across the joint. Step 3: Installing the Mounting Feet thyssenkrupp levant stair lift installation manual top
are mounted in holders at both the top and bottom of the stairs, allowing users to move the lift even when they aren't seated on it. Technical Specifications Thyssenkrupp levant stair lift brake how to remove? 17 Sept 2017 —
Before unboxing the components, you must assess the installation site and gather the necessary equipment. Accurate preparation prevents structural damage and reduces installation time. Site Assessment and Clearance Checks Any you are trying to troubleshoot
Check the rail alignment using a chalk line to ensure it is perfectly straight.
Carefully lift the chassis and align its rollers with the rail channels. Slowly slide the chassis down into the rail. Tighten the bolts securely using a socket wrench,
Tighten all rail bracket screws and chassis fasteners fully.
Inspect the footrest and carriage for trapped objects or debris. Loose rail joints
While the Levant is designed for efficiency, improper installation can lead to safety hazards or premature mechanical failure. A professional, authorized technician (often in under 4 hours for straight lifts) will ensure: Perfect alignment. Regulatory compliance. Activation of the manufacturer's warranty.